A9 with no speed limit.

Around 382 km of the A 9 have no fixed speed limit, according to OpenStreetMap. Number 5 of 95 Autobahns.

All sections
Autobahn Hunters DE
Your location

Show me where you are, and you'll see whether you're on an unrestricted section.

Loading Autobahn sections
Connecting to OpenStreetMap …
On your first visit this takes up to a minute. After that, the map loads from your browser's storage.
Loading data … Open the map only ›

The A 9 in numbers.

No speed limit

382 km

of road with no fixed limit. Counting both directions separately, that's 764 km.

Limited at times

30 km

A limit applies only at night, when wet or at set times.

Variable signs

0 km

Unrestricted only while the signs above the road are switched off.

Ranking

No. 5

of 95 Autobahns with unrestricted sections.

Is there a speed limit on the A 9?

In parts. On around 382 km of the A 9 there is no fixed speed limit, according to OpenStreetMap. Towards München it's 385 km, towards Berlin 378 km. On 30 km a limit applies only at times, for example at night or when wet. On the other sections, OpenStreetMap lists a speed limit or has no information. Even without a limit, the recommended speed of 130 km/h applies.

How up to date is this?

The data comes from OpenStreetMap and is updated several times a day, most recently on 23 November 2026. Roadworks from Die Autobahn GmbH are added every few minutes; temporary limits are not included. Road signs always take priority.

The sections.

Continuous stretches with no speed limit of one kilometre or more, in driving order. Tap a section to see it on the map.

Towards München heading south · 385 km

Plus 3 shorter pieces under one kilometre, 0.8 km in total.

Towards Berlin heading north · 378 km

Plus 7 shorter pieces under one kilometre, 1.7 km in total.

Right now on the A 9

Roadworks, closures and reports affecting unrestricted sections. A speed limit usually applies there.

  • Roadworks

    A38 Erneuerung der Fahrbahn, Kr. Rippachtal, 26-03-005

    AK Rippachtal (aus Richtung Bad Dürrenberg)

    until 15/12/2026

  • Roadworks

    A38 Erneuerung der Fahrbahn, Kr. Rippachtal, 26-03-005

    AK Rippachtal (aus Richtung Pörstental)

    until 15/12/2026

  • Roadworks

    Niemegk - Rosselquelle

    Berlin → Halle/Leipzig

    until 30/03/2027 · 9.0 km in the unrestricted section

  • Roadworks

    Niemegk - Hagen

    Berlin → Halle/Leipzig

    until 30/03/2027 · 1.2 km in the unrestricted section

  • Roadworks

    Klein Marzehns - Rosselquelle

    Berlin → Halle/Leipzig

    until 30/03/2027 · 1.1 km in the unrestricted section

  • Roadworks

    Klein Marzehns - Rosselquelle

    Berlin → Halle/Leipzig

    until 30/03/2027

  • Roadworks

    Rosselquelle - Niemegk

    Halle/Leipzig → Berlin

    until 30/03/2027 · 8.5 km in the unrestricted section

  • Roadworks

    Hagen - Niemegk

    Halle/Leipzig → Berlin

    until 30/03/2027 · 1.2 km in the unrestricted section

  • Roadworks

    Rosselquelle - Klein Marzehns

    Halle/Leipzig → Berlin

    until 30/03/2027 · 1.1 km in the unrestricted section

  • Roadworks

    Rosselquelle - Klein Marzehns

    Halle/Leipzig → Berlin

    until 30/03/2027

  • Roadworks

    Nürnberg-Ost - Nürnberg/Feucht

    Halle/Leipzig → München

    until 28/11, 00:00 · 0.7 km in the unrestricted section

  • Roadworks

    Hermsdorf-Süd - Lederhose

    Halle/Leipzig → Nürnberg

    until 18/12/2026 · 4.2 km in the unrestricted section

  • Short-term roadworks

    Streitau - Bayreuth/Kulmbach

    Halle/Leipzig → Nürnberg

    until 26/11, 06:00 · 3.0 km in the unrestricted section

  • Roadworks

    Hirschberg - Berg/Bad Steben

    Halle/Leipzig → Nürnberg

    max. 80 km/h · until 02/06/2027 · 2.7 km in the unrestricted section

  • Roadworks

    Bindlacher Berg - Bayreuth-Süd

    Halle/Leipzig → Nürnberg

    until 12/09/2028 · 0.6 km in the unrestricted section

  • Roadworks

    A38 Erneuerung der Fahrbahn, Kr. Rippachtal, 26-03-005

    Halle/Leipzig → Nürnberg

    until 15/12/2026 · 0.5 km in the unrestricted section

  • Roadworks

    Bad Dürrenberg - Rippachtal

    Halle/Leipzig → Nürnberg

    until 15/12/2026

  • Roadworks

    Lederhose - Hermsdorf-Süd

    Nürnberg → Halle/Leipzig

    until 18/12/2026 · 2.1 km in the unrestricted section

  • Roadworks

    A38 Erneuerung der Fahrbahn, Kr. Rippachtal, 26-03-005

    Nürnberg → Halle/Leipzig

    until 15/12/2026 · 1.0 km in the unrestricted section

  • Roadworks

    Denkendorf - Ingolstadt-Süd

    Nürnberg → München

    max. 80 km/h · until 31/03/2027 · 4.9 km in the unrestricted section

Source: Die Autobahn GmbH des Bundes, as of 21:12.

Driving on the A 9?

Drive mode tells you when an unrestricted section begins and when it ends.

Open the map

More Autobahns.

All AutobahnsThe longest unbroken stretches

Where the data comes from.

From OpenStreetMap

The map shows Autobahn sections tagged maxspeed=none. The site fetches them via the Overpass API and keeps them in your browser for seven days.

What the map doesn't know

Temporary limits and the current state of variable signs are not in the data. Roadworks come from Die Autobahn GmbH, but not always completely. Where nobody has mapped a speed limit yet, a section may be missing.

The road sign always wins

The map and alerts are an overview, not navigation. Road signs and German traffic law always apply. Don't use the app while driving.

For comparison: in 2015 the Federal Highway Research Institute (BASt) counted around 18,100 km of carriageway with no speed limit, just over 70 percent of the network. This figure is closest to the “both directions” value above. BASt survey 2015 (in German) ›